Gazprom Neftekhim Salavat

Gazprom Neftekhim Salavat


Site: Republic of Bashkortostan, Salavat


Customer: Gazprom Neftekhim Salavat


Project Delivery Timelines: 2012-till present


Service Package: engineering, production equipment of SKIN EFFECT, delivery, construction, installation, supervised installation, commissioning


Facilities:

- Pentane-hexane cut isomerization plant (ПГИ-434)

- 1,095 KTA cat cracking complex. Interim tank farm for LPG storage and feed

- 1,095 KTA cat cracking complex. Selective hydrotreatment of cat cracked gasolines

- Hydrogen unit

- Steam unit cum electric power generation

- Construction of a 5,000 m3 vertical steel tank (Р-14) with floating roof, for slop oil and drainage water, Area "A" in Feed and Product Area of Oil Refinery

- Construction of a 5,000 m3 vertical steel tank (Р-66) with floating roof, for gasoline, Area "B" in Feed and Product Area, Oil Refinery

- Construction of a 5,000 m3 vertical steel tank (Р-66) with floating roof, for gasoline, Area "C" in Feed and Product Area, Oil Refinery

- Construction of a 5,000 m3 vertical steel tank (Р-66) without floating roof, for diesel, Area "B" in Feed and Product Area, Oil Refinery

- 1,095 KTA cat cracking complex. Instrument Room, transformer substation, distribution transformer substation

- 1,095 KTA cat cracking complex. Circulating water supply unit (439). Flare system (440). - Drum for selective gasoline hydrotreatment (449 А)

- Sulfur unit

- Cat cracker of 1,095 KTA cat cracking complex – pump house floor heat tracing

- Acrylic acid unit – comprehensive EHT system

- Acrylic acid unit: open n-butanol pump house; fire pump house; process effluent unit; operator room with transformer substation - distribution transformer substation; chemicals area; feeds and products storage pump; Office building, including a laboratory

- Fire pump house with fire tanks. Phase I

- 1,095 KTA cat cracking complex. Cat cracker.

- Cat cracking complex: LPG storage, selective gasoline hydrotreater, cat cracker, circulating water supply unit

- PSA unit, process technology

- PSA unit, instrumentation

- Construction of H2 unit

- Revamp of a saline waste treater – Area 29 of the Chemical Plant

- Acrylic acid unit: chemicals area; feeds and products storage pump house 1188/4

- Alkaline-sulfide waste treater in the Oil Refinery and Monomer Plant (Gazprom Neftekhim Salavat)

- Feed pump house of Area 13 (Oil Refinery). EHT system for flooring, pipelines, impulse lines

- Revamp of Distribution Transformer Substation 43 (Gas Chemical Plant)

- Isomerization unit (ПГИ-434) (Gazprom Neftekhim Salavat)

- Alkaline-sulfide waste treater in the Oil Refinery and Monomer Plant (Gazprom Neftekhim Salavat)

- Bitumen plant

- Л-35/11-1000 plant. EHT of process pipelines and instruments and controls

- Urea granulation plant

- Л-35/11-1000 plant. Urea granulation plant. EHT of process pipelines and instruments and controls – Distribution Transformer Substation 54 in the Oil Refinery

- Retrofit of process lines for diesel fuel supply from Area “B” in Feed and Product Area, Gazprom Neftekhim Salavat, to diesel fuel storage (ПГУ-410Т) of Novosalavatskaya Steam Generating Plant

- Urea granulation plant. EHT of process pipelines and instruments and controls

- Interconnection pipeline (2.6 km skin effect heat tracing)

- Area “B” in Feed and Product Area

- Area “C” in Feed and Product Area

- Temporary power supply to ГО-2 plant in the Oil Refinery

- Interconnection pipeline (2.6 km skin effect heat tracing) – Phase I

- Interconnection pipeline (2.6 km skin effect heat tracing) – Phase 2

- Repair of Х-259 cooler piping. EHT system 22.430-03003-Н-269/7-ЭОТ

- Repair of pipeline #03-138

- Revamp of sewage treatment. Phase 1 -  Bar screen building (ОС-254)