Gazprom Neftekhim Salavat
Site: Republic of Bashkortostan, Salavat
Customer: Gazprom Neftekhim Salavat
Project Delivery Timelines: 2012-till present
Service Package: engineering, production equipment of SKIN EFFECT, delivery, construction, installation, supervised installation, commissioning
Facilities:
- Pentane-hexane cut isomerization plant (ПГИ-434)
- 1,095 KTA cat cracking complex. Interim tank farm for LPG storage and feed
- 1,095 KTA cat cracking complex. Selective hydrotreatment of cat cracked gasolines
- Hydrogen unit
- Steam unit cum electric power generation
- Construction of a 5,000 m3 vertical steel tank (Р-14) with floating roof, for slop oil and drainage water, Area "A" in Feed and Product Area of Oil Refinery
- Construction of a 5,000 m3 vertical steel tank (Р-66) with floating roof, for gasoline, Area "B" in Feed and Product Area, Oil Refinery
- Construction of a 5,000 m3 vertical steel tank (Р-66) with floating roof, for gasoline, Area "C" in Feed and Product Area, Oil Refinery
- Construction of a 5,000 m3 vertical steel tank (Р-66) without floating roof, for diesel, Area "B" in Feed and Product Area, Oil Refinery
- 1,095 KTA cat cracking complex. Instrument Room, transformer substation, distribution transformer substation
- 1,095 KTA cat cracking complex. Circulating water supply unit (439). Flare system (440). - Drum for selective gasoline hydrotreatment (449 А)
- Sulfur unit
- Cat cracker of 1,095 KTA cat cracking complex – pump house floor heat tracing
- Acrylic acid unit – comprehensive EHT system
- Acrylic acid unit: open n-butanol pump house; fire pump house; process effluent unit; operator room with transformer substation - distribution transformer substation; chemicals area; feeds and products storage pump; Office building, including a laboratory
- Fire pump house with fire tanks. Phase I
- 1,095 KTA cat cracking complex. Cat cracker.
- Cat cracking complex: LPG storage, selective gasoline hydrotreater, cat cracker, circulating water supply unit
- PSA unit, process technology
- PSA unit, instrumentation
- Construction of H2 unit
- Revamp of a saline waste treater – Area 29 of the Chemical Plant
- Acrylic acid unit: chemicals area; feeds and products storage pump house 1188/4
- Alkaline-sulfide waste treater in the Oil Refinery and Monomer Plant (Gazprom Neftekhim Salavat)
- Feed pump house of Area 13 (Oil Refinery). EHT system for flooring, pipelines, impulse lines
- Revamp of Distribution Transformer Substation 43 (Gas Chemical Plant)
- Isomerization unit (ПГИ-434) (Gazprom Neftekhim Salavat)
- Alkaline-sulfide waste treater in the Oil Refinery and Monomer Plant (Gazprom Neftekhim Salavat)
- Bitumen plant
- Л-35/11-1000 plant. EHT of process pipelines and instruments and controls
- Urea granulation plant
- Л-35/11-1000 plant. Urea granulation plant. EHT of process pipelines and instruments and controls – Distribution Transformer Substation 54 in the Oil Refinery
- Retrofit of process lines for diesel fuel supply from Area “B” in Feed and Product Area, Gazprom Neftekhim Salavat, to diesel fuel storage (ПГУ-410Т) of Novosalavatskaya Steam Generating Plant
- Urea granulation plant. EHT of process pipelines and instruments and controls
- Interconnection pipeline (2.6 km skin effect heat tracing)
- Area “B” in Feed and Product Area
- Area “C” in Feed and Product Area
- Temporary power supply to ГО-2 plant in the Oil Refinery
- Interconnection pipeline (2.6 km skin effect heat tracing) – Phase I
- Interconnection pipeline (2.6 km skin effect heat tracing) – Phase 2
- Repair of Х-259 cooler piping. EHT system 22.430-03003-Н-269/7-ЭОТ
- Repair of pipeline #03-138
- Revamp of sewage treatment. Phase 1 - Bar screen building (ОС-254)