GAZPROMNEFT-Moscow Refinery
Site: Omsk;
Customer: Gazpromneft-Omsk Refinery
Project Delivery Timelines: 2009-2021
Service Package: engineering, EHT system delivery, construction, installation, supervised installation, commissioning
Facilities:
- Advanced Oil Refining Complex. Sulfur recovery unit and offsites. Waste water precipitator. 6/0.4 kV transformer substation. Packaged modular building
- Installation of EHT systems for air cooler steam process pipelines. Combined oil refining unit (Euro+) at GAZPROMNEFT-Moscow Refinery
- Circulating water supply unit (БОВ-8а)
- Advanced Oil Refining Complex. Chemical water treater
- Installation of EHT systems for interconnections between process plants at GAZPROMNEFT-Moscow Refinery
- Sulfur recovery unit and offsites. Waste water precipitator in the Advanced Oil Refining Complex
- Active sludge plant, sulfur-alkaline sewage plant, circulating water supply unit БОВ-6, MTBE plant, atmospheric and vacuum distillation unit (АВТ-6), PSA unit, environmental monitoring system
- Revamp of Г-43/107 catcracker
- Gas fractionator 2 cum reflux treater (H2S, mercaptan sulfur)
- Standardization of heater performance of ЛЧ-35/11-1000 Plant in Shop 2
- Hydrogen unit, bitumen unit, nitrogen unit
- Isomerization plant
- Chemical water treater. Roof heat tracing
- Daelim. Advanced Oil Refining Complex. Heat tracing of hydrocracker and H2 unit buried piping
- Dedicated flare system 2
- Site 4137.06 – Liquid nitrogen storage