Gazpromneft-Yamal (Gazpromneft Novy Port)
Site: Novoportovskoye field
Customer: Gazpromneft-Yamal (Gazpromneft Novy Port)
Project Delivery Timelines: 2016-2022
Service Package: engineering, EHT system delivery, construction, installation, supervised installation, commissioning
Facilities:
- infrastructure development of the Novoportovskoye field. Central production facility. Phases 2, 3. Upgrade
- EHT system for Novy Port condensate recovery and transport unit
- Gas condensate facilities. Onsite power grids
- Condensate recovery and transport unit of the gas condensate complex
- Novoportovskoye oil and gas condensate field. Process piping
- Reservoir repressuring of the Novoportovskoye field. Cluster pumping station around clusters # 8, 8.1, 10, 10.1
- Cluster #21 of the Novoportovskoye field
- Training centre at the central production facility in the Novoportovskoye field
- Novoportovskoye oil and gas condensate field. Packaged transfomer substation #2.6в
- central production facility piping in the Novoportovskoye field. Upgrade phases 2-3
- Gas condensate facility piping in the Novoportovskoye field
- Upgrade phases 2-3 of the central production facility in the Novoportovskoye field
- development of the Novoportovskoye oil and gas condensate field. Gas turbine power station
- Well infrastructure development in the Novoportovskoye field
- infrastructure development around the clusters of the Novoportovskoye oil and gas condensate field. Phase 1. Water lines
- EHT system delivery – Yamal high-pressure water line
- infrastructure development around the clusters of the Novoportovskoye oil and gas condensate field. Phase 1. Water lines
- EHT system for a cluster pumping station
- Central production facility
- infrastructure development around the clusters of the Novoportovskoye oil and gas condensate field. Phase 1
- development of the Novoportovskoye field. Power supply to satellite settlements. EHT system. Water supply grids (from the rotators’ camp to Mys Kamenny settlement) (8663-КТП1т).
- development of trial areas of the Novoportovskoye field for trials. Landfill for domestic and industrial waste. Upgrade.
- Manufacture of EHT equipment – Yamal high-pressure water line
- Infrastructure development around the clusters of the Novoportovskoye oil and gas condensate field. Phase 2. Water lines
- Rotation camp for line maintenance personnel of Gazpromneft-Yamal at the Tazovskoye site. Rotators’ camp