Orsknefteorgsintez
Site: Orsk, Orenburg Region
Customer: Orsknefteorgsintez
Project Delivery Timelines: 2012-2021
Service Package: engineering, EHT system delivery, construction, installation, supervised installation, commissioning
Facilities:
- EHT installation for process pipelines and equipment for an automatic bitumen loading rack – Plant 19-6М
- Installation of feed coarse filter (Ф-100А) of the hydro cracker. EHT system.
- Vacuum distillation unit and interconnection pipelines. Installation of coking inhibitor feed system. EHT system.
- Hydro cracker cum H2 unit. EHT system. Additional scope.
- Steam boiler room 2. Additional scope.
- Design engineering of a power supply system for Steam boiler room 2
- Steam boiler room 2. Unit 003. Steam boiler section Р1. Flooring EHT
- Vacuum distillation unit
- 110 kV substation in Oil Refinery 2, 110 kV outdoor switchgear
- Chemical water treatment of the hydro cracking complex.
- N2 station #2.
- 2.5 km long degassed liquid sulfur line
- H2 unit, process, instrumentation
- H2 unit, offsites flare ГЗФ-400 line
- Hydro cracker cum H2 unit
- Flare system and water unit of the hydro cracking complex
- Hydro cracker cum H2 unit. Additional heat tracing scope
- Offsite grids of the hydro cracking complex/ EHT system for pipelines 80P02-1021, 250UW-0001, 150P01-1021
- Offsite grids of the hydro cracking complex.
- Sulfur unit. 1st process train; 2nd process train
- Water unit of the hydro cracking complex
- H2 unit
- Visbreaking complex
- Retrofit of the vacuum section of the crude desalter and vacuum pipe still
- Visbreaker – heater (П1)
- H2 gas compression section
- Diesel hydro treater (ЛЧ-24-2000)
- crude desalter and vacuum pipe still, transformer substation 31
- central distribution substation 1а
- Revamp of Distribution Transformer Substation 33 of 22-4М Plant
- Isomerization plant
- Unit 22-4М
- Visbreaker. Additional piping
- Hydro cracker. Ф-100А filter
- Retrofit of the hydro cracker cum H2 unit
- Modification of visbreaker circulating water loop (add’l)