Severstal


Site: Cherepovets, Vologda Region


Customer: Severstal


Project Delivery Timelines: 2020-2021


Service Package: engineering, EHT system delivery


Facilities:

- Construction of burden charge bypass conveyor lines for blast furnaces 1, 2, 4. Distribution station РП-151. Funnel heat tracing. Power equipment

- Delivery of EHT materials and power boards for Severstal’s facilities

- Centralized air supply system. Hopper top heat tracing. Power equipment

- Coke bin tresle, with skip pit. Heat tracing of hydraulic pipelines. Power equipment

- Supported cyclone. Heat tracing of hydraulic pipelines. Power equipment

- Coke bin tresle, with skip pit. Heat tracing of hydraulic pipelines. Power equipment

- Iron ore bin tresle, with skip pit. Heat tracing of hydraulic pipelines. Power equipment

- Bell-less top. Heat tracing of water lines. Power equipment

- 3D-TOPSCAN ТМТ. Heat tracing of hydraulic pipelines and lube oil lines

- Construction of burden charge bypass conveyor lines for blast furnaces 1, 2, & 4. Raw material conveyor lines. Charge conveyor to transfer station ПС-5. Transfer station ПС-5а. Centralized filling station room. Hydraulic and lube oil lines. Pipeline heat tracing

- Supported cyclone. Condensate line heat tracing from blast furnace gas analysis system. Power equipment

- Scrubber with a spray catcher. Heat tracing of hydraulic pipelines. Power equipment

- Gas treater building. Heat tracing of roof and gutters. Power equipment