+ PDF
Back to projects

Sibneftetransproyekt

Sibneftetransproyekt


Site: Omsk


Customer: Sibneftetransproyekt


Project Delivery Timelines: 2021


Service Package: engineering, EHT system delivery


Facilities:

- Petersburg Oil Terminal. Construction Phase 1

- Urengoi gas production department

- Revamp of X-mas tree and process pipelines, installation of corrosion monitoring systems in the facilities of the Bovanenkovskoye oil and gas condensate field

- Revamp of Novator Plant under the Federal State Reserve Agency – Ural Regional Office

- “Czech” storage – Inv.# 1000306 (Gazprom Transgaz Samara)

- Revamp of power / heat / water supply systems of the company branches. Boiler room of the power supply area (Urengoi gas production department). Amenity rooms for diesel generator field operators

- Petersburg Oil Terminal. Construction done to (including in lieu of obsolete facilities to be dismantled): Site 139, Elevator Site, Coal Harbour, Saint Petersburg; Elevator Site 32 letter Я, Coal Harbour, Saint Petersburg; Oil Loading Zone, Coal Harbour road, Saint Petersburg. Construction Phase 1

- Revamp of power / heat / water supply systems of the company branches. Boiler room of the power supply area (Urengoi gas production department). Amenities and operations building

- Revamp of power / heat / water supply systems of the company branches. Boiler room of the power supply area (Urengoi gas production department). Electrical laboratory for protection and repair of internal combustion engines

- Revamp of Novator Plant under the Federal State Reserve Agency – Ural Regional Office. Material storage. Phase 7

- Petersburg Oil Terminal. Construction done to (including in lieu of obsolete facilities to be dismantled): Site 139, Elevator Site, Coal Harbour, Saint Petersburg; Elevator Site 32 letter Я, Coal Harbour, Saint Petersburg; Oil Loading Zone, Coal Harbour road, Saint Petersburg. Construction Phase 1

- Bovanenkovskoye oil and gas condensate field

- Urengoiskoye oil and gas condensate field. EHT system for pipelines (re-routed, newly designed, existing)

- Samburgskoye field. Degasser Area. EHT system

- Gazprom Transgaz Tomsk. Gas distribution station ГРС-1

- Office and Amenity building of Emergency Response & Remedial Office. EHT system for roofing

- Compressed natural gas cylinder inspection building. EHT system for roofing

- Automatic gas distribution station, Krasnogvardeiskiy District, Sadovoye settlement, Inv. # 50296\2КР, consolidated repairs of gas distribution station equipment

- Polyana Compressor Station 

- Sharan Compressor Station


Please submit your request