Sibneftetransproyekt
Site: Omsk
Customer: Sibneftetransproyekt
Project Delivery Timelines: 2021
Service Package: engineering, EHT system delivery
Facilities:
- Petersburg Oil Terminal. Construction Phase 1
- Urengoi gas production department
- Revamp of X-mas tree and process pipelines, installation of corrosion monitoring systems in the facilities of the Bovanenkovskoye oil and gas condensate field
- Revamp of Novator Plant under the Federal State Reserve Agency – Ural Regional Office
- “Czech” storage – Inv.# 1000306 (Gazprom Transgaz Samara)
- Revamp of power / heat / water supply systems of the company branches. Boiler room of the power supply area (Urengoi gas production department). Amenity rooms for diesel generator field operators
- Petersburg Oil Terminal. Construction done to (including in lieu of obsolete facilities to be dismantled): Site 139, Elevator Site, Coal Harbour, Saint Petersburg; Elevator Site 32 letter Я, Coal Harbour, Saint Petersburg; Oil Loading Zone, Coal Harbour road, Saint Petersburg. Construction Phase 1
- Revamp of power / heat / water supply systems of the company branches. Boiler room of the power supply area (Urengoi gas production department). Amenities and operations building
- Revamp of power / heat / water supply systems of the company branches. Boiler room of the power supply area (Urengoi gas production department). Electrical laboratory for protection and repair of internal combustion engines
- Revamp of Novator Plant under the Federal State Reserve Agency – Ural Regional Office. Material storage. Phase 7
- Petersburg Oil Terminal. Construction done to (including in lieu of obsolete facilities to be dismantled): Site 139, Elevator Site, Coal Harbour, Saint Petersburg; Elevator Site 32 letter Я, Coal Harbour, Saint Petersburg; Oil Loading Zone, Coal Harbour road, Saint Petersburg. Construction Phase 1
- Bovanenkovskoye oil and gas condensate field
- Urengoiskoye oil and gas condensate field. EHT system for pipelines (re-routed, newly designed, existing)
- Samburgskoye field. Degasser Area. EHT system
- Gazprom Transgaz Tomsk. Gas distribution station ГРС-1
- Office and Amenity building of Emergency Response & Remedial Office. EHT system for roofing
- Compressed natural gas cylinder inspection building. EHT system for roofing
- Automatic gas distribution station, Krasnogvardeiskiy District, Sadovoye settlement, Inv. # 50296\2КР, consolidated repairs of gas distribution station equipment
- Polyana Compressor Station
- Sharan Compressor Station