Syzran Oil Refinery
Site: Syzran, Samara Region
Customer: Syzran Oil Refinery
Project Delivery Timelines: 2014-2021
Service Package: engineering, EHT system delivery, construction, installation, commissioning
Facilities:
- Diesel fuel hydro treatment complex (Syzran Oil Refinery). Diesel hydro treater. Letdown and desuperheating station. EHT of process pipelines
- Diesel fuel hydro treater. Pipelines, impulse lines and instrumentation
- Terminal 2
- Construction of transformer substation #93 for the active sludge plant
- Mooring complex (Syzran Oil Refinery). Terminal 2
- Atmospheric and vacuum distillation unit (АВТ-5)
- EHT system for discharge line to emergency sump (ТК-3 unit)
- Terminal 1
- VGO hydro treater. Drainage lines
- LPG storage. Pipelines, drums and pump house flooring